Saturday, May 12, 2012

906 Ponte Vedra Blvd: Trim & Painting Detail

This video explains the process we use on our custom trim work to get a painted finish that is smooth as silk.

Thursday, May 3, 2012

2012 Historic Preservation Award

This is the second year in a row that Coastal Living Properties, LLC was recognized by the Jacksonville Historic Commission for the fine job restoring the abandoned home at 1318 Dancy Street. This home was uninhabited for over  seven years, and was scheduled to be demolished for safety reasons. The work took over six months to complete. Here Paul proudly displays his certificate presented to him by the Historic Commission on 5/3/12.

Tuesday, April 24, 2012

906 Ponte Vedra Blvd- Short Tour

We're about 80% done with this project, so now seems like a good time to do a tour of each floor to show the progress, design, etc..


Wednesday, April 18, 2012

906 Ponte Vedra Blvd.


Busy day today. Multiple crews working on trim, painting and metal roof.

Published with Blogger-droid v2.0.4

Friday, April 6, 2012

906 Ponte Vedra Blvd: Open Cell Blown Insulation

Open Cell Foam insulation is becoming very popular with new construction because of its high energy efficient value. The foam insulation and no roof vents transform the attic space into cooler temps in the summer and warmer in the winter- the concept is similar to a insulated ice-cooler. In the end this home will have much lower heating and cooling bills.




906 Ponte Vedra Blvd: Window & Exterior Door Installation Process

Our system for weather proofing the exterior doors and windows is extensive because the lose of heat and cooling through gaps in these areas can be costly, and more importantly preventing water intrusion is vital, especially so close to the ocean.


Tuesday, February 14, 2012

906 PVB Framing /Dry-in

Now you can see the complete home at the finished framing stage. Dry-in process is half way done. House wrap, windows and doors next.


Monday, January 30, 2012

906 PVB Framing interior wall

Interior walls now finished. Excellent progress! Expect all the decks and stair stringers to be completed this week.

Wednesday, January 25, 2012

906 PVB Framing

We're at the framing stage right now on this project. The work is moving along nicely. At this rate, we're expecting the roof and exterior sheathing will be done by the end of January.

Tuesday, January 10, 2012

906 PVB Foundation

Block cell concrete fill...adding additional structural strength by installing rebar vertically in the open CMU cells and filling it with concrete.

Friday, January 6, 2012

906 PVB Foundation


Foundation poured today. Things are starting to take shape on the jobsite.

Tuesday, December 20, 2011

906 Ponte Vedra Blvd

Coming out of the ground- block stem walls installed today.

Saturday, December 17, 2011

906 Ponte Vedra Blvd

After being held back from the 5"+ of rain last weekend, the concrete was poured today on the footings.

Monday, December 12, 2011

906 Ponte Vedra Blvd

Starting digging the footers today at the new construction project across the street from the ocean. The foundation work is projected to take 2 weeks. Check back with us soon to see the progress.



Friday, December 2, 2011

Ponte Vedra Coastal New Construction

We are starting a new construction project across the street from the beach in Ponte Vedra. Today the site work was completed. Soon the foundation crew will be working on the footers, stem walls, retention wall, etc.. Check back often to see the progress on this fantastic home with ocean views.




More renovated apartment homes at 2755 Park Street

The response have been excellent, even for this off season time of the year for tenant moving during the busy end of year / Christmas season. This is unit #1 at 2755 Park Street.

Sunday, October 16, 2011

2755-2765 Park Street

Here's a video tour showing the before & after on the apartments in Avondale

Wednesday, September 28, 2011

2765 Park Street Apartments Video Tour

YouTube Video Showcases new apartments....Enjoy!


Wednesday, September 14, 2011

Park Street Apartments

New exterior paint brings great curb appeal. Landscaping to come soon. Check back with us to see the final job,

Monday, September 5, 2011

Park Street Apartments

Here's a look inside one of the 12 units at the property. New Waynescoating on the walls, fresh paint, new kitchen cabinets, fixtures, appliances, vanity, toilet and shower. These units will make a great apartment home centrally located to all the restaurants in Avondale and Riverside.

We've renamed the property "Avondale Place." Check back soon. We'll have photo's of the outside and interior showing the final renovated apartment.